Customers Air Trade Center International ° AmecSpie ° Archivision ° BnS engineering ° Costan Refrigeration DuPont de Nemours ° Belgian Scrap Terminal ° ClimaConstruct ° Continental Teves ° Indicator Jacobs Belgium ° Fina ° Gedas ° GSK Bio ° GTI ° Kemira ° Oleon ° Mycom Europe ° RES PM ° Vitech ° Zephyr
|
Projects Industrial refrigeration plants Refurbishment of HVAC and civil works for R&D lab New R&D labs Insulation of a 15.000 ton NH3 storage tank Air conditioning in an 3 stories office building HVAC in production hall Ventilation of locker and shower rooms Automatic filling, labelling, packaging and palletising line Barcode labelling of boxes and pallets Indoor Air Quality projects Refurbishment of office building with R&D labs Cleanrooms for Pharmaceutical industry
|
Consulting for Baxter ° Belgacom ° CERA ° FaMac ° Océ ° King Sturge ° Mayfield Property Management TT Hasselt ° Tandartsenpraktijk ° UbiCenter ° Verzekeningen Perdieus °
|
Industrial refrigeration plants |
Design,
engineering, project and construction management of industrial
refrigeration plants with halocarbons (R22) and ammonia (NH3)
for food processing, slaughterhouses and process installations.
Projects up to 600.000,00 € References: l'Ardennaise, Kunstijsbaan Turnhout, Lonki, Mora, Pieters visbedrijf, ... |
|
Air conditioning |
Design,
engineering, project and construction management of comfort air
conditioning installations.
References: AMI, GoodYear, Fabrimetal Antwerpen, Ford Antwerpen, Hörmann, Shell, Shopping Center Wijnegem, ... |
|
Computerrooms |
Turn-key projects
for computerrooms from 4 m² up to 1000 m².
Air conditioning, waterchillers, raised floors, suspended ceilings, electrical distribution panels, no-break / UPS, fire extinguishing, entrance control, ... References: Agfa-Gevaert, Bank vaqn Breda, BP, CIPAL, Colruyt, DuPont, Eternit, Fabrimetal, Ford Motor Company, Makro, Procter & Gamble, Havenbedrijf, OCMW Antwerpen, Sidal, Sony, Stad Antwerpen, Teepak, Unilever ... |
|
Refurbishment of HVAC and civil works for R&D lab |
Refurbishment of a
2000 m² lab and office building for DuPont Performance Coatings.
New installation of HVAC and Fume Hood Extraction, air conditioning in offices, new ceilings and windows, new electrical installation. Total installed airflow approx. 45.000 m³/h Total installed cooling capacity 300 kW Total installed heating capacity 490 kW Budget: approx 1.500.000,00 € (1999-2000) Timing: 18 months |
|
Automatic filling, labelling, packaging and palletising line |
|||
Design,
engineering, implementation, project & contract management of a new
automatic filling line for clear coats (DuPont Performance Coatings).
Semi-automatic depalletiser for metal containers (1 - 5 l), Ex-proof full automatic rotary filler with a capacity of 6000 l/h for 7 can sizes, automatic capper for 3 different caps and 2 sizes of lids, automatic labeling machine for round and rectangular cans, inkjet printer for application of batchnumber, packaging machine for 7 sizes of cardboard boxes, automatic label applicator for boxes, robot palletiser with two palletising stations, can, boxes and palet conveyors. Budget: approx 1.750.000,00 € (2001-2002) Timing: 18 months |
|||
|
This site is best viewed with IE5.0 640x800.
Webdesign KAVEE ©2004, all rights reserved.